By Name   H

H

12 Hammersmith Grove
London, UK
Completed 2016
The second phase of development of the former NCP site saw the construction of an additional eleven storey building, alongside the practice’s first project in the scheme. This building provides 20,783 sqm (GEA) of high quality office space on the upper floors, with reception and restaurant use ...
The second phase of development of the former NCP site saw the construction of an additional eleven storey ...
10  Hammersmith Grove
London, UK
Completed June 2013
The centre of Hammersmith enjoys superb tube and bus links to Central London and west towards Heathrow Airport and the Thames Valley beyond. The development of a former NCP site saw the delivery of 33,250 sq m (GEA) of high quality office space, contributing to the area’s long ...
The centre of Hammersmith enjoys superb tube and bus links to Central London and west towards Heathrow Airport and ...
Halle St Peters Extension
Ancoats, Manchester
Competition
A shortlisted competition proposal to extend the Hallé St Peter’s music studio and performance hall in Ancoats, Manchester. The single storey glazed pavilion-like structure runs along the front of the church, where a cantilevered canopy is punctuated by a tower containing stacked acoustic ...
A shortlisted competition proposal to extend the Hallé St Peter’s music studio and performance hall in Ancoats, ...
Hillside Houses
Millendreath, UK
Planning Approval
Millendreath is a small enclosed valley in south east Cornwall. An area previously neglected, the plans for the 35 hectare (90 acre) site will provide a mix of uses, including holiday and residential accommodation with new leisure, retail and business activities. The design concept for the ...
Millendreath is a small enclosed valley in south east Cornwall. An area previously neglected, the plans for the 35 ...
A B C D G H I L M N P R S T U V W Y

Enter your search terms in the field above.

Individual terms should be separated by a comma ','